Dock Restoration
Restoration of a waterfront dock where the original timber structure had rotted through at the bearing points, requiring the frame to be rebuilt before any new decking could be laid.
01Brief
Client Objective
Return the dock to safe, usable condition by rebuilding the structure rather than surfacing over a failed frame.
Construction Approach
The old decking came up first so the condition of every beam and joist could be seen rather than guessed at. Sections that had gone soft were cut out and replaced with treated timber. Joist tops were taped before the new boards went down, which is the detail that decides whether the next failure is in five years or fifteen.
Scope of Work
- Removal of failed decking and rotted framing
- Assessment of the remaining structure
- New treated structural timber where sections had gone
- Protective membrane to the joist tops
- Composite decking cut and fixed
- Edge, step and trim work
- Removal of the old material from site
Materials Used
- Treated structural timber
- Composite decking boards
- Joist protection membrane
- Marine grade fixings
02Problem and Response
The Challenge
Working over water and sand with tide and access constraints, on a structure where the extent of the rot was only visible once the surface came off.
The Solution
The dock was worked in sections so the structure stayed stable throughout, with the scope confirmed against what was actually found rather than assumed at quoting stage.
03Gallery
Project Photographs
Select any image to enlarge it.

Original beams showing rot at the bearing points

New joists in place with decking going down

Composite boards cut and set on site

Edge and framing repair in progress
Additional progress and completion photographs for this project will be added here as they are supplied.
05More Work
Related Projects



Planning Something Similar?
Send us the details of your property and what you are trying to achieve.